BLINKERSIGN® | DIGITAL | FEDERAL / GSA | GLOBAL EXPORT | GREEN | LED PRODUCTS | PARKING | SAFETY | SIGNALS | SIGNS| STREETSCAPE | TRAFFIC CONTROL | V-LOC | WORK ZONE | HOME | CONTACT
TRAFFIC & PARKING CONTROL CO., Inc.          1.800.236.0112
TAPCO - TRAFFIC AND PARKING CONTROL CO., INC.

StreetScapes by TAPCO

SEARCH TABLE OF CONTENTS MORE INFORMATION CONTACT
V-Loc Post Anchor Systems- Installation

New Breakaway Regulations (PDF)

View "The Road Ahead" ! --- Hi-rez / Low rez
(Get the Free Real Video Player)

Also see:

WARNING! Contact Digger's Hotline before installation.

TAPCO and its distributors will not be liable for damage or injury resulting from unauthorized or improper installation.

ALIGNMENT:
To install round and V-channel posts, position the point of the radiating fins so it points parallel to the road, with the point of the fins toward oncoming traffic (Figure 1). For installation of square posts, position the point of the radiating fins toward oncoming traffic, but at a 45-degree angle (1/8 turn) away from the road (Figure 2). This alignment maximizes the reusability after crashes, saving you the time and cost of reinstallation.

Figure 1
Enlarge
Figure 2
Enlarge

FOR INSTALLATION INTO DIRT:
Use of a V-Loc drive cap is recommended to prevent mushrooming of the angle iron and fin, making installation of the wedge difficult. Manual and power drive caps are available. The V- Loc can also be installed using a wood block and maul. To prevent damage to the welds, do not pound directly on the welded fin. Drive the V-LOC straight down until the bottom of the fin is approximately 4 inches above the ground. Use a level to make sure the angle iron is plumb from both directions. Then drive the V -LOC down until it is flush with or slightly below the ground surface. Remove or compact the dirt inside the socket to allow post to be inserted 10 inches. Insert post into socket.

FOR INSTALLATION INTO ASPHALT AND CONCRETE:
Make a hole 6 to 7 inches in diameter. Drive the V-LOC into the earth below the slab until it is flush with the surface. A drive cap is recommended (see previous paragraph). Insert post or pole (see alignment) and wedge. Plumb the post or pole and fill the hole around the exterior of the socket with new asphalt or road repair material. Do NOT place this material inside the socket where the post and wedge are placed. For concrete, installation is recommended at the time of initial pouring. See alignment instructions. Ask about the new V -LOC system for concrete.

WEDGE INSERTION:
Insert wedge (Figure 3) with side hole closest to the top so that the wedge puller can properly grasp the wedge if removal becomes necessary. Start the wedge in at an angle (Figure 4). Drive the wedge in so it is level with the top of the V-LOC or up to 1 inch below the top.

Call your V -LOC distributor if you have any further questions,
or call TAPCO TOLL FREE: 1-800-236-0112.

 
TOP SEARCH TABLE OF CONTENTS MORE INFORMATION CONTACT
Streetsigns TOC | Luminaires TOC | Poles TOC | Posts TOC

TRAFFIC AND PARKING CONTROL CO., INC.
800 WALL STREET ELM GROVE, WI 53122
PHONE: 262-814-7000 FAX: 262-814-7017
TOLL FREE: 1-800-236-0112 TOLL FREE FAX: 1-800-444-0331
TAPCO, Inc. Copyright © 2008


TAPCO StreetScapes from Traffic and Parking Control Co., Inc.
Streetscapes from TAPCO